84model Z31 50th Anniversity model 5F Re paint to a new color installation of new cores etc |
|
|
|
![]() |
(1)Taking the engine & transmission out. ( Nommal wa at Datsun Freeway to take out the way it is shown in the photo) |
|
|
![]() |
(2)The engine was not at its best. re setting will be done |
|
|
![]() |
(3)Oil leak from the transmission was deteced. New sealing will be installed |
|
|
![]() |
(4)Oil leak from th crak shaft and head cover |
|
|
![]() |
(5)Many conponets were changed to a re-builded item in this acation |
|
|
![]() |
(6)New cores and harness were installed one by one by hand. Heat protecion tapeing was done this time |
|
|
![]() |
(7)Re-builded Turbo and power steering pump was installed |
|
|
![]() |
(8)installing the turbo |
|
|
![]() |
(9)Finally the work on the engine has been finished |
|
|
![]() |
(10)rust was found so the it was removed and under coating was re-done. |
|
|
![]() |
(11)In side of the engine room is painted before the mounting of the engine. |
|
|
![]() |
(12)Black was painted before hand to make it look better! |
|
|
![]() |
(13) Painting in the workes! Usaualy the painting is done by two staffs at the same time |
|
|
![]() |
(14)Special painting both has been installed at Datsun Freeway to give the best of the best. |
|
|
![]() |
(15)"royal black" has been painted on the lower parts of the car |
|
|
![]() |
(16)disassembly and washing of the air condition unit |
|
|
![]() |
(17)installation on new sponge sealing. The doctes were also washed. |
|
|
![]() |
(19) Special Alloy wheels for this Model were re-painted |
|
|
![]() |
(20)Installtion of new front window screen. |
|
|
![]() ![]() |
(21)Look even better that it was from the factory ( Own by Mr.Yamamoto) |
|
|