84model Z31 50th Anniversity model 5F Re paint to a new color installation of new cores etc |
|
|
|
(1)Taking the engine & transmission out. ( Nommal wa at Datsun Freeway to take out the way it is shown in the photo) | |
|
|
(2)The engine was not at its best. re setting will be done | |
|
|
(3)Oil leak from the transmission was deteced. New sealing will be installed | |
|
|
(4)Oil leak from th crak shaft and head cover | |
|
|
(5)Many conponets were changed to a re-builded item in this acation | |
|
|
(6)New cores and harness were installed one by one by hand. Heat protecion tapeing was done this time | |
|
|
(7)Re-builded Turbo and power steering pump was installed | |
|
|
(8)installing the turbo | |
|
|
(9)Finally the work on the engine has been finished |
|
|
|
(10)rust was found so the it was removed and under coating was re-done. | |
|
|
(11)In side of the engine room is painted before the mounting of the engine. | |
|
|
(12)Black was painted before hand to make it look better! | |
|
|
(13) Painting in the workes! Usaualy the painting is done by two staffs at the same time | |
|
|
(14)Special painting both has been installed at Datsun Freeway to give the best of the best. | |
|
|
(15)"royal black" has been painted on the lower parts of the car | |
|
|
(16)disassembly and washing of the air condition unit | |
|
|
(17)installation on new sponge sealing. The doctes were also washed. | |
|
|
(19) Special Alloy wheels for this Model were re-painted | |
|
|
(20)Installtion of new front window screen. | |
|
|
(21)Look even better that it was from the factory ( Own by Mr.Yamamoto) | |
|
|